Wytheville VA real estatereads from the Town's own plants, map and ordinance
The Town of Wytheville draws its drinking water from Reed Creek at a plant of its own, in service since 1950, and returns treated wastewater to the same creek from a second plant of its own. Those two plants, and a zoning ordinance in effect since 1969, are why a parcel inside the town limits reads differently from Wythe County ground outside them.
A named USGS point, <em>not the corporate line</em>
The marker is the U.S. Geological Survey's point for Wytheville, a populated place in Wythe County, where USGS elevation data return about 2,282 feet. It is a named point, not the middle of town and not a boundary. The corporate limits are not drawn on this map; the Town's zoning map settles which side of them a parcel is on.
Wytheville, Virginia: 36.9485 N, 81.0848 W. Open this spot on OpenStreetMap.
Map tiles by Esri with OpenStreetMap data. Pins mark the town, not a parcel; ask Lowell for a parcel map.
Reed Creek at both ends: a water plant and a wastewater plant the Town runs
The Town of Wytheville treats its own drinking water and its own wastewater, and Reed Creek sits at both ends of the system. The Town's water treatment plant at 1025 Grayson Road has been in service since 1950, draws from Reed Creek and can produce up to 4 million gallons of drinking water a day, according to the Town's plant page.
The Town's wastewater treatment plant at 852 Atkins Mill Road is a Class 2 plant designed for 4.0 million gallons a day, and the Town says it treats wastewater "so it can be released back into Reed Creek". The Town maintains about 108 miles of water mains and about 87 miles of sewer mains.
New River water is an addition to the Reed Creek plant, not a replacement for it. Wytheville also buys from the New River Regional Water Authority, which the Town describes as a partnership of Wytheville, Wythe County and Carroll County, and the Town says it currently purchases between 1 and 1.5 million gallons a day. The regional plant itself belongs to the page on Austinville, where it stands on the New River.
Town water beyond the corporate line comes on terms the Town sets
Town of Wytheville water and sewer can reach past the town limits, but only on terms the Town sets. The Town's charter (1946, c. 18, as amended) lets it lay water mains "either within or without the corporate limits" to serve water customers on both sides of the line, and lets it charge a different rate for service outside them.
The Town's fee schedule effective July 1, 2025 adds a surcharge for water and sewer service outside the town limits. The sheet states the size of that surcharge two different ways, and one statement excludes the Peppers Ferry Rd area, which it bills at the current Wythe County usage and connection fees for residential customers. The amount for a given parcel is the Town's to state.
The Town's 2013 comprehensive plan describes how that worked in 2012 and 2013: town water was available to about 200 residential, business and industrial users outside the corporate limits, and Progress Park, outside the town, took town water while the County ran its sewer. Inside the limits, the plan says, the Town in most cases extended a sewer connection up to 300 linear feet or to the owner's property line, whichever was less; outside them, connections were handled case by case. That policy may have changed since.
14.489 square miles by the Census, and a line moved by annexation
The Town of Wytheville covers 14.489 square miles of land, plus 0.093 square miles of water, in the Census Bureau's 2023 Gazetteer.
The line has moved. The Town's 2013 plan says the 1990 annexation made Reed Creek the entire southern boundary, and that the latest change was a 2007 boundary adjustment with Wythe County of about 160 acres north of Old Stage Road, from Petunia Road to Reed Creek. The plan's own total after that was about 9,250 acres.
Annexed ground does not arrive unzoned: the Town's ordinance applies to property coming into the Town by annexation or otherwise, "pending an orderly amendment of the Ordinance". Whether a particular parcel sits inside the limits is settled by the Town's zoning map and its Planning Department, and a disputed boundary by a surveyor, never by a mailing address.
Ordinance No. 640, in force since July 15, 1969
Wytheville has been zoned since July 15, 1969, when the Town's Ordinance No. 640 took effect, and its district boundaries are the ones drawn on "The Zoning Map of the Town of Wytheville", kept on file in the office of the Town Manager.
The Town's Ordinances page lists these district articles:
- A-1 Agricultural
- R-1, R-1A and R-1M Residential
- R-2 and R-2 FH Residential
- R-3 and R-3 MH Residential
- MA-1 Medical Arts
- B-1, B-2 and B-2 DT Business
- M-1, M-1M and M-2 Industrial
The Town's own documents disagree on how many districts there are, so the Planning Department settles which district, and which version of its rules, applies to a parcel.
Three stated purposes say the most about land. The A-1 Agricultural district exists "to protect the more rural, open type uses including farming operations within the corporate limits". The B-2 DT Business district is for developing and maintaining an attractive downtown business area "by way of preservation and appropriate additions". The M-2 Industrial district is for heavy commercial and industrial operations "which may create some nuisance".
Lot area floors in A-1 and R-1
Minimum lot areas are floors, not a finding that a lot will take a house. In A-1 and R-1, a single-family lot served by public water and sewage disposal needs at least 10,000 square feet. In A-1, a lot with public water but individual sewage disposal needs at least 15,000 square feet, and the same articles say the required area for any permitted use on an individual sewage disposal system "shall be approved in writing by the health official", with the administrator free to require a greater area where the health official considers it necessary. Where public water is not available in A-1, the health official approves the private water system.
An administrator, a planning desk and a rewrite under way
The ordinance is enforced by an administrator appointed by Town Council, and the Planning Department reviews all development proposals against it, from site plans for new commercial and multi-family construction to change of use, special use and rezoning applications, filed through the Town's OpenGov/Viewpoint Cloud portal. The Town's posted list of amendments runs to Ordinance 1413, adopted June 13, 2022.
The ordinance is also being replaced. The Town is writing a Unified Development Ordinance that will fold its subdivision and zoning ordinances into one, and a Comprehensive Plan revision is under way, which the Town's plan-update engagement site expects Town Council to adopt in January 2027. That is the site's expectation, not a date the Town has fixed.
Two interstates that meet at Wytheville, told in the Town's words and VDOT's
Interstate 81 and Interstate 77 meet at Wytheville: the Town's 2013 comprehensive plan says the two "intersect within the town of Wytheville", and counts 7.52 miles of interstate roadway inside the corporate limits.
The same plan named Exits 70 and 73 on Interstate 81, together with an Interstate 77 interchange, as the nucleus of highway commercial development in Wytheville. That was a 2013 account of where commercial ground clustered, and no source behind this page places a named exit inside the town line.
The sources describe the shared road only in part. VDOT's I-81/I-77 Wytheville design-build bundle covers improvements "where I-81 at Wytheville meets I-77 northbound toward West Virginia", begun in late 2023 with completion estimated for summer 2027. The Town's own directions treat I-81 South and I-77 North as one approach that leaves at Exit 72. VDOT's 2026 corridor plan lists, as a study need rather than a funded project, a northbound auxiliary lane from Exit 70 (N 4th Street) to Exit 72, tagged in VDOT's own label to Wythe County and the Town of Wytheville.
VDOT's 2025 traffic-volume layer files segments of U.S. 11, U.S. 21 and U.S. 52 under the jurisdiction Town of Wytheville, two of them with one end at a point it labels "WCL Wytheville", while an I-81 segment on the same layer is filed under Wythe County. Those are VDOT's jurisdiction entries, not a survey of the town limits.
Right-of-way use on a town street goes through the Town's Public Utilities and Engineering permitting. The office's own listing beside an interchange is not Wytheville ground: the 9 acres at I-77 Exit 19 lie in Carroll County, with an Austinville mailing address.
Pine Ridge, clay over limestone, and a creek along the southern edge
Wytheville is hilly ground with sudden changes in elevation: the Town's 2013 plan says Pine Ridge interrupts a gently rolling terrain across the town's east and west axis, and that slopes in the town range from 5.5% to 30%.
The plan gives three spot elevations rather than a high and a low:
- Eastern edge of the town
- 2,297 feet
- Central area of the town
- 2,284 feet
- Western edge of the town
- 2,428 feet
Under the slopes, the plan describes limestone blanketed by varying depths of clay and topsoil, with the Frederick Hagerstown association as the dominant soil: deep and well drained, over a clayey subsoil. Its caution carries its own qualifiers: shallow limestone "coupled with the rugged terrain often make grading costs prohibitive for development in this area". The plan maps no parcel to that sentence. What clay subsoil and shallow rock mean for a house site is the subject of soils that are hard to build on.
Wytheville is on the list of places where Wythe County's plan says karst, "carbonate rocks at or near the land surface", exists; what that list can and cannot tell you about one tract belongs to the answer on land common in Wythe County.
Reed Creek, a major tributary of the New River, runs along the town's southern edge, and the plan says flood-affected areas along with steep slopes "are reported to be a serious constraint for development in Wytheville". A parcel's mapped flood zone is read from the FEMA flood map, not from the plan.
Farming was the largest use of land inside the town in the plan's 2012 count, about 3,127 acres or 34.5% of Wytheville's land area.
150 East Monroe Street for town ground, the county offices past the line
Inside the Wytheville town limits, the Town answers the zoning, utility and right-of-way questions for a parcel, from its municipal offices at 150 E. Monroe St., Wytheville, VA 24382.
| The question | Who answers | Line as the Town publishes it |
|---|---|---|
| Is the parcel inside the town limits, and in which district? | Planning Department, against the Town's zoning map | 276-223-3352 |
| Site plan, change of use, special use or rezoning | Planning Department, filed through the OpenGov/Viewpoint Cloud portal | 276-223-3352 |
| Can town water or sewer serve it? | Public Utilities and Engineering, through the water and sewer availability applications | Town offices, 276-223-3333 |
| Right-of-way use on a town street | Public Utilities and Engineering | Town offices, 276-223-3333 |
| The Town's comprehensive plan | Posted in the Town's Document Central | Town website |
Outside the limits the answers change hands: Wythe County had no countywide zoning when its FAQ was read in September 2026, and that FAQ leaves the zoning of Wytheville's own ground to the Town. The county's rules and the office to call first are set out with the counties we work in.
Two of the five factors we read on a tract, utilities and zoning, are the Town's to answer inside Wytheville. Lowell Bowman, a Virginia real estate salesperson, is the person to call about a Wytheville parcel, and the office's free valuation is an opinion of value, never an appraisal. Other towns have their own pages on the index, one page per town.
Current listings
Status and price come from the SW VA Association of REALTORS MLS record at every build; a listing that leaves the market leaves this page the same day.
No active Bowman Real Estate listings in Wytheville right now. Lowell knows what is about to come on the market here; ask him, or see every current listing.
Wytheville: which side of the town line is the parcel on
Send a few details and Lowell will come back with an honest read. No cost, no obligation.
Got it. Thank you.
We'll be in touch shortly with an honest read.
Good questions, straight answers.
Will the Town of Wytheville extend water or sewer to land beyond its corporate limits?
The Town of Wytheville can, on terms the Town sets. The Town's charter lets it lay water mains and serve water customers outside its corporate limits and charge a different rate there, its fee schedule effective July 1, 2025 adds a surcharge for water and sewer service outside the town limits, and its 2013 plan said sewer connections outside the limits were then handled case by case. The Town's Public Utilities and Engineering office takes the water and sewer availability applications that answer the question for a given parcel.
Does Wytheville's water come from the New River?
Only in part. The Town of Wytheville runs its own water treatment plant at 1025 Grayson Road, in service since 1950 and drawing from Reed Creek. The Town also buys water from the New River Regional Water Authority and says it currently purchases between 1 and 1.5 million gallons a day from it, in addition to its own supply.
Which zoning districts does the Town of Wytheville have?
The Town's Ordinances page lists A-1 Agricultural; R-1, R-1A, R-1M, R-2, R-2 FH, R-3 and R-3 MH Residential; MA-1 Medical Arts; B-1, B-2 and B-2 DT Business; and M-1, M-1M and M-2 Industrial under Ordinance No. 640. The Town's own documents disagree on the count, so the Planning Department settles which district and which rules apply to a parcel.
Where this page's facts come from
Every rule, office and figure above traces to one of these. Rules change; check the office before you act on one.
- Water Treatment Plant: 1025 Grayson Road, Reed Creek, since 1950 Town of Wytheville
- Wastewater Treatment Plant: 852 Atkins Mill Road, discharge to Reed Creek Town of Wytheville
- Water and Sewer Maintenance: mains, network map and availability applications Town of Wytheville
- New River Regional Water Authority: the partnership and the Town's purchase Town of Wytheville
- Public Utilities and Engineering: utility availability and right-of-way permitting Town of Wytheville
- Utility fees, rate effective July 1, 2025 (PDF) Town of Wytheville
- Charter of the Town of Wytheville (1946, c. 18, as amended) Code of Virginia
- Comprehensive Plan 2013: ground, utilities and Chapter 16 of the Town Code, annexation, interstates (PDF) Town of Wytheville
- Document Central: the Comprehensive Plan Town of Wytheville
- One Wytheville: comprehensive plan update engagement site Town of Wytheville
- Ordinances: the district articles of Ordinance No. 640 Town of Wytheville
- Ordinance No. 640, Article 2, Interpretation (PDF) Town of Wytheville
- Ordinance No. 640, Article 4, Districts (PDF) Town of Wytheville
- Ordinance No. 640, Article 5, A-1 Agricultural (PDF) Town of Wytheville
- Ordinance No. 640, Article 6, R-1 Residential (PDF) Town of Wytheville
- Listing of amendments to Ordinance No. 640, through Ordinance 1413 (PDF) Town of Wytheville
- Planning Department: development review, permits, the UDO and contacts Town of Wytheville
- Directions to Wytheville Town of Wytheville
- 2023 Gazetteer places file for Virginia (Wytheville town land and water area) U.S. Census Bureau
- Geographic Names Information System: Wytheville, populated place U.S. Geological Survey
- Elevation Point Query Service at the mapped Wytheville point U.S. Geological Survey
- Improve 81: Wythe County bundles, the I-81/I-77 Wytheville design-build bundle Virginia Department of Transportation
- I-81 Corridor Improvement Plan, Final Report, January 2026 (PDF) Virginia Department of Transportation
- Bidirectional Traffic Volume 2025: Town of Wytheville segment labels Virginia Department of Transportation
- Bidirectional Traffic Volume 2025: I-77 and I-81 segment labels in Wythe County Virginia Department of Transportation
- Frequently Asked Questions: no countywide zoning, the towns zone their own ground Wythe County, Virginia
- Comprehensive Plan: karst formations and sinkholes Wythe County, Virginia